Sat Mar 20: I see the light at the end of the tunnel
Rocker cover has pretty much finished its polish, just a few fiddly bits between the lettering to fixup. Manifold has been made and new turbo is mounted with new 3" snout. New dump pipe has been made which consits of a 2.5" main feed with a seperate wastegate feed.
Intercooler piping is due this week with some misc wiring to be completed (haltech, fuel pump etc). After that its time to hit the rollers. Guys rekon I should be rolling in 2wks assuming it passes Eng and EPA inspections.
3" intake and new manifold.
closer view
new manifold
rocker and manifold
new dump, needs to be cleaned up
under the car, hole is for O2 sensor, the seperate feeds join into 3" pipe
business end of the exhaust... just waiting on the cat.